The technical pilot material for the pilot participants should include at least:

  • The updated deliverables from the DESIGN stage;
  • the BUILD stage deliverables such as the implementation & usage guidelines;
  • test material such as example data messages;
  • the DSD xml-schemas
  • the location of the pilot SDMX registry 
  • the issue log that was created in the PLAN & ORGANISE stage