Skip to end of metadata
Go to start of metadata

 

  • Shorten the names of process 2.3 and 2.4 (delete statistical and methodology
  • Make it clearer than now already in the sub-process name that sub-process 2.5 includes the design of phase 6 Analyse.
  • Shorten the names ofprocess 2.6 (state just workflow and exclude production systems).

 


 

 

 

  • No labels

4 Comments

  1. I agree with removing the word methodology but am less comfortable with removing "design production systems" from 2.6. 

  2. 2.6 Design workflows

  3. I would keep production system (singular). Perhaps the term system has too much connotation in IT (I do not know). In case someone can propose another term that reflects the integrated result including the total process management.

  4. 8/11: Decision based on voting outcomes:

    Changes made to 2.3, 2.4 and 2.5. No change for 2.6